Skip to main content

What an EICR includes

The inspection, the codes, and the report — from £169. NAPIT-registered engineers.

This page is the test itself: what we inspect, how C1/C2/C3 are coded, and how the certificate is issued. Book Manchester coverage on the EICR Manchester page, or landlord rules on landlord EICR.

We turn up — or your EICR is free
Same-day certificate
No call-out fee
Free retest after remedials
The Inspection

What we test

A full inspection of the fixed installation to BS 7671 — consumer unit, circuits, earthing, and every accessory we can reasonably access. The report is Satisfactory or Unsatisfactory, with every observation coded.

Consumer unit and circuit protection
All fixed wiring throughout the property
Ring main and radial circuits
RCD protection — presence and function
Earthing and bonding
Sockets, switches, and accessories
Fixed lighting circuits
Cooker and immersion heater circuits
Garage, outbuildings, and external circuits
Loft and cellar wiring condition

Observation codes

C1

Danger present

Immediate risk of shock or fire. Made safe on the spot — not left until re-let.

C2

Potentially dangerous

Remedial works required. In a rented property, written confirmation of completed works is due within 28 days of the report — or sooner if the report specifies.

C3

Improvement recommended

Advisory only. Does not fail the EICR. No action legally required.

FI

Further investigation

A circuit or component could not be fully assessed.

FAQ

EICR questions

Prices are in the booking card above. If something isn’t listed, call us.

An Electrical Installation Condition Report is a formal assessment of the fixed electrical wiring and installation. It identifies defects, damage, deterioration, and non-compliances, and codes each observation C1, C2, C3, or FI.
Private landlords: at least every 5 years from the certificate date, or sooner if the previous report recommends. HMOs: every 5 years. Commercial: typically every 5 years, or as recommended. An earlier date on the previous report takes priority.
C1 observations must be made safe immediately. C1 and C2 observations mean the report is unsatisfactory. In the private rented sector, the landlord must complete the remedial work and obtain written confirmation within 28 days of the report — or sooner if the report specifies. We quote remedials within 24 hours, carry out the works, and include a free retest.
C1 means danger present — must be made safe immediately. C2 means potentially dangerous — remedial works are required. C3 is an improvement recommendation — the installation can still be satisfactory and no action is legally required. FI means a circuit or component could not be fully assessed and needs further investigation.
From £169 for 1–2 bed, £199 for 3 bed, £239 for 4 bed, £269 for 5 bed, 6+ bed POA, £55 per room for HMOs (minimum £275). No call-out fee. Free retest with our remedial works. All prices include the certificate issued the same day.
No. We can coordinate access with your tenants or the current occupants. Provide the contact details when you book.

Book the slot, or send us the address

We respond to enquiries within one working day

CallWhatsApp